Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13671470

- Product Categories
- Waterproof
- cps-CL reaction sticky web
- cpc non-bitumen membrane
- Composite rubber bitumen me..
- Polymer self-adhesive water..
- Self-adhesive modified bitu..
- Friendly Links
Information Name: | DAL pre-shop the wet adhesive waterproofing membrane shop |
Published: | 2015-03-27 |
Validity: | 30 |
Specifications: | kg |
Quantity: | 10000000.00 |
Price Description: | |
Detailed Product Description: | DAL pre-shop the wet adhesive waterproofing membrane laid I. Introduction and Product Caption 1 Introduction DAL pre-shop shop wet adhesive waterproof membrane, is capable of construction in the wet base surface or after pouring concrete bonding waterproofing membrane. The material contains some special properties of the polymer can be achieved creatures react with cement mortar or grout prime reached with the base surface or structure of the main body to achieve full mutual sticky effect. 2, product images Second, product characteristics 1, DAL wet pre-shop shop can achieve full self-adhesive waterproof membrane bonded directly after pouring the concrete structure, bonding, reliable, safe and environmentally friendly. 2, self-adhesive membrane using a wet-laid cement (sand) pulp and primary bonding, can in the wet surface of the base construction, reduce the process and shorten the construction period. 3, DAL pre-shop shop wet adhesive waterproofing membrane has good adhesive properties, and structure of the full realization of full stick, effectively prevent breakage leaking water channeling phenomenon. Three, DAL pre-shop shop wet adhesive waterproofing membrane technology performance indicators Executive Standard: GB / T 23457-2009 four, product specifications models wide Thickness Length 1.0m 2.0mm, 3.0mm, 4.0mm 20m, 15m, 10m five , the scope of an industrial housing and basic civil basement, roof waterproofing. 2, for waterproof subways, highways, railways, bridges and tunnels. 3, planted roof, grain storage, air-raid shelter, sewage treatment, artificial lakes, basements, tunnels, subways, high-speed rail, bridges, landfill garbage tank seepage and other high-grade waterproofing is more important. Sixth, the construction method, the primary treatment after primary treatment surface clean, damp grass roots can, but you can not have clear water; the construction of a wet-laid process, a dry surface will need watering grass roots moist, dry shop construction method, can be directly on a dry base surface Brushing primary treatment agent. 2, using no less than 32.5R ordinary portland cement and proportions right amount of water into a paste, water-cement ratio of 1: 0.4, with an electric mixer operating stirring 1-2min, stirring standing 5-8min after backup . 3, with good water slurry scraper evenly mixing the right amount of scratching on the base, while wiping the mud-coated side of the waterproofing membrane Stones at the top, and the exhaust rolling cement. 4, two adjacent membrane seams lap blessing way, slowly torn aside self-adhesive side of the buffer zone can be directly attached to the construction. V. Notes 1, the membrane should be stored in a dry and ventilated environment. 2, different categories, specifications coil should be stacked separately stored at temperatures not exceeding 45 ° C. Laying flat coil height does not exceed five, stand up when stacked storage monolayer. 3, to prevent tilting or manometry, covered with tarpaulin when necessary. 4, coil into the site before construction ban sun exposure, in order to avoid overheating resulting in the isolation membrane is difficult to tear. 5, the construction of a wet-laid process, due to high temperature insulating film is difficult to tear, can pour cold water on the membrane surface isolation, reduce the temperature isolation tear film. 6, due to the bonding properties of this product is very good, once formed, is difficult to recover after the cross-linking, so construction workers need to plan well in advance, when the Stones roll as a success, to avoid duplication of construction inconvenience. Six, a project vision, Pictures |
Admin>>>
You are the 11954 visitor
Copyright © GuangDong ICP No. 10089450, Acer cattle waterproof materials company All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 11954 visitor
Copyright © GuangDong ICP No. 10089450, Acer cattle waterproof materials company All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility