Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13671470

- Product Categories
- Waterproof
- cps-CL reaction sticky web
- cpc non-bitumen membrane
- Composite rubber bitumen me..
- Polymer self-adhesive water..
- Self-adhesive modified bitu..
- Friendly Links
- home > Supply > RAM-CL strong rapid reaction sticky film self-adhesive waterproofing membrane cross Price
Information Name: | RAM-CL strong rapid reaction sticky film self-adhesive waterproofing membrane cross Price |
Published: | 2015-06-09 |
Validity: | 30 |
Specifications: | 1.2mm 1.5mm 2.0mm |
Quantity: | 100.00 |
Price Description: | |
Detailed Product Description: | RAM-CL rapid reaction force cross the membrane sticky adhesive waterproofing membrane price I. Introduction and Introduction 1 Introduction RAM-CL rapid reaction force cross the membrane sticky adhesive waterproof membrane is coated with plaster cement mortar waterproof additive concrete structure basement waterproof primer paste is to add organic and inorganic cementitious material such as silicon-based, so they can be cross-linking reaction. Good hydrophobic properties combined production of the Trinity, impermeability and cohesion rigid waterproof material. 2. Introduction Figure II, Introduction 1. The construction is simple. 2. Unique infiltration. 3. It is environmentally friendly product, non-toxic, tasteless, no radiation. 4. Has a very good two-way nature. Install tile, brick and stone directly on film. 5. There is a very long operation time and short curing time, saving time for other processes. 6. Good resistance to aging and good weather resistance corrosion protection of concrete and reinforced cement. Third, the application 1. Plane and elevation of concrete structures indoors and outdoors, the bottom surface of cement, brick, light brick and other institutions. 2. Applicable to the basement, parking, swimming pool, pond, kitchen, bathroom, balcony. 3. Factory buildings, water, underground parking and other stable structural components. Fourth, the base surface treatment ■ base surface must be firm, smooth and free of dust, grease, mold release agents, batik materials. ■ All small gap and trachoma can fill a small amount of flour and water slurry by mixing. ■ external and internal angle should be rounded. ■ leakage, the first to be processed, and then began to further waterproof. ■ base surface should be pre-wet, and no clear water. The construction can be faster and smoother; construction efficiency can be increased, the cost can save material. RAM-CL rapid reaction force cross the membrane sticky adhesive waterproof membrane construction technology ■ 25kg powder mixed 7-8kg water brush; 6-7kg water pressure with painted 25kg mixed powder. ■ First, pour the water into a container and slowly add flour depending on the proportion and stirred until no code or paste. Simmer 5 minutes, then stirring may get better results. ■ brush using more than two directions cross roller or brush; according to waterproof standard, basic materials. The second time the construction should be the first two hours after the completion of, this is the best time, the first layer is not completely dry or sticky. ■ If the first layer has been done for a long time, you should wet the base surface after construction, there is no clear water begins. Stirring constantly to prevent precipitation ■ intermittently. ■ complete the construction within 24 hours shall be to prevent human trampling. When it is hot and dry, increasing the water to improve the adhesion strength and waterproof effect. Five, RAM-CL rapid reaction force cross the membrane sticky adhesive waterproofing membrane Precautions Specifications: 1.2mm 1.5mm, 2.0mm thickness of 1.2mm, 1.5mm, 2.0mm Weight: 45kg Others: single, double, Ⅰ type, Ⅱ type, wet-laid, pre-coated, wet-laid process, wet laid type, pre-shop law, pre-shop type ■ The mixed slurry should be used within two hours, if it is dry without water and reuse. ■ Construction should start from 5 ℃ to 40 ℃, not 0 OC or rain. ■ Provide ventilation installation construction ventilation or closed environment. ■ construction should be based on the surface is wet, there is no clear water begins, can greatly improve the waterproof effect; if it takes a long time, after the second construction should begin between wet. ■ Any pipeline environment, nodes and interfaces, expansion joints, structural joints, a variety of substrates, etc., with the potential of micro-vibration and motion, it is recommended to use flexible waterproof clouds. Sixth, the production base Niu Xugong Zhang Publisher |
Admin>>>
You are the 11954 visitor
Copyright © GuangDong ICP No. 10089450, Acer cattle waterproof materials company All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 11954 visitor
Copyright © GuangDong ICP No. 10089450, Acer cattle waterproof materials company All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility